SAP ERP Server Client Project Wise Landscape Full Details / Overview
- The SAP project is implemented within the SAP SE System environment, known as SAP Landscape. The Production Server, Quality Server, and Development Server landscape are prepared by the SAP BASIS Consultant. SAP system clients are designed for various uses.
- SAP Software Version (ECC 6.0 (EHP6)) for SAP Server
- A specific SAP system, 310, 320, 330, 210, 220, 230, 100

![]() |
| SAP MM Project Landscape Servers & Clients Full Details |
Also Check: SAP Consultant Vs End User Level Training Full Details
|
Development
Server SAP ECC
6.0 (EHP6) |
👉 👉 |
Quality Server SAP ECC 6.0 (EHP6) |
👉 |
Production Server SAP ECC 6.0 (EHP6) |
|
310- Sandbox Client
320- Configuration Client
330-
Development Test Client
|
210- Testing
Client
220- Quality
Client
230-
Training Client |
100-
Production Client |
Overview of SAP ERP Project Clients
310- Sandbox Client
SAP Consultants are given access to a sandbox client to test and simulate business scenarios. SAP Consultants use this client for self-practice.
The configuration process follows the business plan. This client is the one that designed the project. This client is where the enterprise structure base configuration and final configuration are completed. Another name for this client is Golden Client.
330: Development Test Customer
The project is developed by SAP specialists who also carry out testing. Testing is done using the business process master list (BPML) for both unit and integration testing.
210: Client Testing
The core team member or module lead (an employee of the organization) prepares the testing sheet and conducts the testing. Reports are checked and post-transaction testing is done.
220-Quality TestingThe organization is shown every step of the business process, and its SAP consultants administer the User Acceptance Test (UAT). Obtaining company approval for the business process is known as UAT.
230: Client Training
The training document is followed when conducting end user training. Training materials are created based on employees' job profiles and assigned roles.
100- Production Client
The production customer project has reached its go live stage. On this client, the real business is operated. Every employee uses their own user ID and password to log in to this client and log their daily business transactions.
Hope you like the above overview of SAP ERP Server Project Landscape very much so don't forget to share with your loved ones on many social media like Facebook, Instagram, Pinterest, Linkedin, Twitter, etc.
Check Also: Major Differences of SAP R/1, R/2 & R/3 Servers
Join Our Telegram Page for more important PDF Downloads and notifications.
