{OX10/*} Create Plant in SAP ERP MM Module ECC & S/4 HANA Project

Hello Guys, we bring here the full step by step procedure to Create a Plant in SAP ERP MM Module ECC 6.0 & S/4 Hana 1909 Implementation Project..You Know what it is created by SAP MM Consultant in real time scenarios. No doubt it is the most important part of the SAP MM (Material Management) Module. 

Definition / Explanation of Plant in SAP ERP

  • Within a company code form, a plant is an operating region or branch where services are rendered or production is carried out.
  • There is only one business code issued to the factory. A corporate code may contain multiple plants.
  • A facility may have multiple storage areas where material stocks are controlled.
  • Each division and plant is designated a specific business region.
  • A plant may be allocated to multiple combinations of distribution channel and sales organization.
  • A plant may be shipped from multiple locations. Multiple plants can share a shipping point. 
{OX10/*} Create Plant in SAP ERP MM Module ECC & S/4 HANA Project

How to Create Plant in SAP ERP MM Module ECC 6.0 Implementation Project

  • First, log on to your SAP ERP Account with User Id & Password.
SAP Login Page
  • Now use T-Code OX10 to directly go to create Plant Display Page in SAP ERP as per screenshots.

You can also SAP Path to Define Plant in SAP ERP As per screenshot (Menu Path is given below on this article)
SAP Menu Path for Creating Plant

SAP Menu Path for Creating Plant

  • Now create on Define Copy, delete, check Plant and copy the standard plant code to create new one.
         Note: SAP always recommend copy the existing one plant code rather that create new one.

Define Plant 1

Define Plant 2

Define Plant 3

Define Plant 4

Define Plant 5

Define Plant 6
Define Plant 7

Define Plant 8

Define Plant 9

Define Plant 10

  • After that Click on Define Plant then click on Position button select input your recently created Plant now Edit as per your requirements (See screenshots)
Define Plant 1

Edit Plant 1

Edit Plant 3


{OX10/*} Create Plant in SAP ERP MM Module ECC & S/4 HANA Project

  • Now Click on the save button and press enter key.

Define Plant 8

  • Congratulation! you have been successfully created Plant in SAP ERP ECC 6.0 MM Module Implementation Project.
  • Now if you want to check your recently created Plant then just click on Position button and enter your Plant ASTY and press enter as per screenshot

Edit Plant 1

How to Create Plant in SAP ERP MM Module S/4 HANA 2208 Project

  • Follow the above provided simple step by step procedures in ECC 6.0 and fill in all the required details as per the screenshot mention below.

{OX10/*} Create Plant in SAP ERP MM Module ECC & S/4 HANA Project

{OX10/*} Create Plant in SAP ERP MM Module ECC & S/4 HANA Project
  • Now Click on Save Button.
  • Congratulation! you have been successfully create a Plant in SAP ERP S/4 Hana MM Module Implementation Project.
SAP Menu Path for Define Plant:::
TCode- OX10
Menu Path: SPRO> SAP Reference IMG> Enterprise Structure> Definition > Logistics General > Copy, Check, Delete Plant

Hope you enjoy the above provided How to Create Plant in SAP ERP ECC & S/4 Hana Project very much so don't feel shy to share with your loved ones on various social medias like Facebook, Whatsapp, Pinterest, Instagram, Twitter, Linkedin etc. 

Also Read:- SAP MM Implementation Project Business Blueprint Full Details

Like Our Telegram Page for more interesting content based on SAP MM Module.

1 Comments

  1. Hi Sir,
    Will please help me.
    With my implementation project.
    Please sir ��

    ReplyDelete
Previous Post Next Post